Marshall Creek Lift Station Haines Junction YT


Haines Junction, YT

 

Client

Champagne and Aishihik First Nations

Architect

Associated Engineering

Engineer

Associated Engineering

General

Johnston Builders

Project Type

Water Utility

Location

Haines Junction YT

Construction Sector

Industrial

Status

Current Project - Estimated Completion Spring 2024

Generator, Kiosk, Pumps, Wet Well and Associated Instrumentation will be supplied Champagne and Aishihik First Nations.

Scope included a 200A 347/600V 3ph4w Electrical Kiosk, 50KW 347/600V 3ph Diesel Generator w/ 24 hr, Exterior Wet Well Supply Fan, and associated Instrumentation/ Controls. FPEI supplied and installed all site lighting, incoming utilities, interconnecting power, control, and instrumentation cabling. Lift station is connected via a 5G cellar network with the existing waste water utilities.

Haines Junction

Yukon

 
 
Previous
Previous

Vernon Health Centre