Barkman Concrete Plant Phase 1 MV SWG
Merritt, BC
Client
6825347 Manitoba
Architect
Sharon Wang
Engineer
FALCON Engineering Ltd.
General
Acres Enterprises Ltd
Project Type
Utility
Location
Merritt, BC
Construction Sector
Industrial
Status
Completed Project - August 9, 2022
25KV Substation and Medium Voltage VFI Switch Gear for new Concrete Plant
Scope included 2 Way VFI, HV BCH Meter Cabinet, 3 Way VFI, and a 2.0MVA Oilfilled Xfmer.
Fun Fact:
This was the first S&C BC Hydro approved 3 Way VFI switch installed in the province. A culmination of 5 years of R&D for S&C and FPEI are proud to have installed there first one!
Derek,
You don't know me, I am the Barkman lead electrician at Merritt. I wanted to thank you for the excellent energization procedure and FLHA. Well done.
Brent Norman
RSE, CET.
![04.01.jpg](https://images.squarespace-cdn.com/content/v1/5e34401268d0e50cfe2227bf/c469d254-b288-4df7-8624-85bfd756fdb5/04.01.jpg)
![x3Ixw7JkXWJRuX0F.jpg](https://images.squarespace-cdn.com/content/v1/5e34401268d0e50cfe2227bf/078e0616-a472-446b-8084-5642efa4c7c3/x3Ixw7JkXWJRuX0F.jpg)
![NQlAZOhyY7VJKQU7.jpg](https://images.squarespace-cdn.com/content/v1/5e34401268d0e50cfe2227bf/c7e9bb6f-7f15-4cda-a0b0-18b0e5ccad2f/NQlAZOhyY7VJKQU7.jpg)
![ic7IfTbICoACXLdI.jpg](https://images.squarespace-cdn.com/content/v1/5e34401268d0e50cfe2227bf/bd174590-e5db-46dc-8202-bd48b310e5bc/ic7IfTbICoACXLdI.jpg)
![2u9czksKz0D76h90.jpg](https://images.squarespace-cdn.com/content/v1/5e34401268d0e50cfe2227bf/930d86a3-2cca-42b3-b14f-800bd69cf2f9/2u9czksKz0D76h90.jpg)
![CT PT Install.jpg](https://images.squarespace-cdn.com/content/v1/5e34401268d0e50cfe2227bf/802ec50e-a617-4eed-bc36-d2de48ffbc7c/CT+PT+Install.jpg)